Case studies

How we help our clients achieve the best results

When it comes to Asset Performance Management, MaxGrip has been taking a leadership role for over twenty years, working for dozens of clients in a number of industries. Below you’ll find interesting case studies from various companies we helped within the Oil&Gas, Food&Beverages and Infra&Utilities industry: from smaller enterprises to world-leading multinationals. These case studies will give you an in-depth perspective on which solutions we came up with, and the results we helped our clients achieve.

Filters

Filter our case studies by using the selection boxes below.

Challenge
Industry
Solution
Maintenance Health Check and Optimization result in massive cost reduction

Impressive savings for LNG plant

MaxGrip performed a Maintenance & Integrity Build Health Check and made an optimization plan for an LNG plant. This saved thousands of man-hours worth over $ 1.75 million year on year.

Read more
Smart data management

BoM’s and Spares in a matter of months

MaxGrip’s commitment to get things done in the simplest manner made a big difference. Using our own database as a bridging tool, we were able to create the Bill of Materials (BoM’s) and Spares files for a new FPSO in a matter of months.

Read more
Global Maintenance Excellence Program

75% time savings with deploying global maintenance standards

A tank storage provider asked MaxGrip to support the implementation of the company’s global maintenance excellence program that standardises and automates maintenance in all tank terminals.

Read more
Save time and money

Maintenance & Integrity Build for newly acquired FPSO

When quickly incorporate a new Floating, Production, Storage and Offloading (FPSO) according to its own strict standards, MaxGrip saved time and money by optimizing all data on maintenance and integrity before the transfer from Maximo to SAP.

Read more
Effective solutions

Cost control efforts save 10,000 man-hours every year

MaxGrip’s experience in Oil & Gas and good cooperation with the client, provided effective solutions for cost control and more condition-based maintenance, yielding a Hands on Tool Time reduction of 10,000 hours every year.

Read more
Rapid EAM Deployment

Fast-track RCM study and EAM deployment in refinery expansion

For subcontractors, MaxGrip performed a Reliability Centered Maintenance (RCM) study for a major refinery expansion project. Speed was of the essence, and MaxGrip provided rapid EAM deployment.

Read more
Mitigating risks

How we helped standardize asset management

A German Oil and Gas producer is expanding its asset base and activities. In two pilot projects, MaxGrip laid the foundations for global asset management by standardising the asset management and risk mitigation methods.

Read more
Maximize asset availability

Tools & Data Program allows optimization

To support the business and operational processes, and maximize asset availability at optimal cost, MaxGrip helped to set up the Maintenance, Reliability and Turnarounds (MRTA) Tools & Data Program.

Read more
RBI Assessment Saves Oil & Gas Producer $848k per Year

RBI Assessment Saves Oil and Gas Producer $848k per Year

MaxGrip reduced man-hours for inspection and maintenance from 81.000 hours to 18.000 hours – calculated over 12 years. The estimated cost reduction was $848K per year on man-hours alone for the upcoming 12 years.

Read more